Showing posts with label Railway heritage. Show all posts
Showing posts with label Railway heritage. Show all posts

Monday, 29 August 2016

The Opening of the Dunedin to Invercargill Railway & New Zealand's First High Profile Railway Accident, 22nd January 1879


A Rogers "K" Class locomotive of the type used on the
inaugural Dunedin to Invercargill express, c.1880
Note the "balloon" spark arresting funnel.
[Source : Alexander Turnbull Library]

After recently featuring the first passenger train to run between Christchurch and Dunedin in September 1878 I then turned my attention to the railway line from Dunedin to Invercargill which opened for through traffic just a few months later on Wednesday, the 22nd January 1879. While the main line south of Dunedin would not be as challenging in regards to gradients or curvature the inaugural express would be, even now, remembered for a serious and avoidable accident which would mar the elaborately planned celebrations at Invercargill, thus becoming "New Zealand's first high-profile railway accident".

Handover of The Last Section

On Friday the 17th January 1879, Mr Ussher, the Resident Engineer, along with Mr Grant, the General Manager, made an inspection of the newly completed section of line between Balclutha and Clinton with a Fairlie engine and carriage prior to the formal handover from the contractors to the Railways Dept. the following day. Delays caused by poor weather had in fact caused the opening to be delayed from the 7th January so a large back-log of freight had by now built up which amply demonstrated the urgent need for this new through route.


K94, one of the K Class Locos ordered in 1878,
as it appears today at the Plains Railway.
[From my own collection]

Yankee "K" Class Locomotives

The 'Yankee" American built locomotives selected to work the inaugural express on the 22nd January,"which have lately arrived and been erected in the railway workshops" and which "have been working on the Christchurch section on trial, and have fully answered all expectations", were of the Rogers "K" Class (numbered between K92 and K97). The South Island Commissioner [General Manager] of Railways, Mr William Conyers, had ordered "eight express engines... from the Rogers Locomotive Works" and "six goods engines of the 'Consolidation' type from the Baldwin shops, both to be in readiness for the opening of the through main line from Christchurch to Dunedin and Invercargill".

Strenuous Efforts to Convert the Hon. Gentleman

The two "Yankee" locomotives, including one first class passenger car "for the accommodation of the party of Dunedin bowlers", were sent down from Christchurch on Sunday the 19th January. As the Attorney-General, the Hon. Mr Stout, availed himself of this opportunity to travel south "without loss of valuable time" he was accused by the "Morning Herald" of travelling on the Sabbath [a sacred day] with a consequent "exhibition of secularism" which was an affront to the working man "more especially as it affects their seven days food for six days work". Other papers were quick to point out that it was a special train and in fact conveyed not only a Director of the self same "Herald" newspaper but also "prominent members of the Presbyterian and other Churches". In fact, "The Otago Daily Times" reported, either humorously or sarcastically (as the case may be), that "strenuous efforts were made to convert the hon. gentleman by singing Moody and Sankey hymns most lustily during part of the journey".

A Tedious Two Days' Coach Journey

The afore-mentioned two engines would work the inaugural express and subsequent timetabled passenger expresses between Dunedin and Invercargill. The normal timetabled journey time for an "express" passenger train would be, taking into account the unfenced nature of part of the line, six and a half hours. This was still a great improvement on a "tedious two days' coach journey" traversing frequently boggy, pot-holed and unreliable country roads or "an almost equally unpleasant sea voyage".

"No Ladies Going"

The afore-mentioned Mr Conyers, cabled to the Mayor of Invercargill that he and other guests would commence their journey south from Christchurch at 8.40 am on the 21st January with an overnight stop in Dunedin. He further advised "No ladies going". Fully 500 invitations had been issued with many joining the train at points south. The distribution of tickets for the inaugural train had been in the hands of Mr Conyers, which drew criticism of "centralisation" from some quarters, including from Dunedin, as not even the Railways Engineer in Chief or the Public Works Dept. had had any say in who would be invited. But as "The Otago Daily Times" noted "of course everyone cannot be accommodated".


A Programme for the Centenary of the
Dunedin to Invercargill Railway, 1979.
[From my own collection]

Departure of the Inaugural Express from Dunedin

The inaugural express train, drawn by the two American locomotives and hauling fourteen large carriages and three brake vans, departed Dunedin at 10.20 am on Wednesday the 22nd January 1879. Brake vans were a necessity as the carriages themselves were totally unbraked. Arrival in Invercargill was, in hindsight, timed rather optimistically for 4.15 pm.

Besides the "popular" Mr Conyers, special guests on board included the Hons. Messrs William H. Reynolds (representing James Macandrew, Member of Parliament for Dunedin who was ill), the Hon. John Ballance and the Hon. Robert Stout (all representing the Cabinet) along with other (named) members of the Government Legislature, and the Mayors of Christchurch and Dunedin, with the train being under the charge of Mr Grant and Mr Armstrong.

Tokomairiri [Milton] was reached on time at 11.55 am where the Mayor and local dignitaries came on board to continue the journey south. Departure was timed for 12 noon but left slightly late at 12.09 pm, continuing through to Balclutha which was reached at 1 pm, being now 20 minutes behind schedule. Here 20 guests joined the train "including the leading men of that township".

The Seven Span "Blair Bridge"

Just prior to entering Balclutha township the railway passed the site of the old north Balclutha terminus then crossed the new and impressive 870 foot timber and iron truss "Blair Bridge" [named by the Minister of Public Works, the Hon. WJM Larnach, for the District Engineer Mr Blair] spanning the Clutha River. Seven spans of 120 feet each were supported on seven foot diameter cast iron cylinders filled with concrete and sunk to a depth of 70 to 80 feet with a 30 feet stone arch spanning the Kaitangata road at the eastern end of the bridge. The railway then travelled over the short one mile 22 chain extension into Balclutha, having been opened, along with the bridge, in January 1878.

With a reporter on board able to hand messages to the local telegraph offices en-route the news of the days events, which appeared in evening papers that same day, have an immediacy to them; "The weather is delightful and everyone is enjoying the trip".

A Most Unpleasant Jumping Sensation

Upon departure from Balclutha the line now began "a continual ascension" through the newly opened four mile "Toiro section" constructed with unemployed "day labour" under Inspector McMillan and then the 16 mile 22 chain "Clinton section" constructed by contractors Messrs Proudfoot and Mackay. Through these sections the line passes the remote wayside stations of Waitapeka, Toiro, Warepa, Kaihiku and Waiwera to Clinton, being now 65 miles and 42 chains distant from Invercargill. Despite a small section of line entering "Proudfoot's section... where a most unpleasant jumping sensation was experienced" the road through the newly laid section was found to run very smoothly. And, "At many of the wayside places settlers were congregated, waving handkerchiefs, &c."

Fate Would Play a Cruel Trick

"On account of our having to moderate the speed considerably" arrival at Clinton was now well past the envisaged arrival time of 1.30 pm. Approaching the station an arch had been erected with bunting suspended from many buildings in the township. While it had been intended that a special train convey the Mayor of Invercargill and Councillors to Clinton to meet the special express this plan was abandoned just a couple of days before. With hindsight, this turned out to be a wise move. Thus with few passengers to pick up departure was prompt and "good time was made between Clinton and Gore". But fate would now play a cruel trick on this auspicious occasion.

Invercargill Arrangements

The Town Council declared that Wednesday afternoon would be celebrated as a "half holiday" with flags flying. A parade of Voluntary Battalion members would take place at 3 pm to the Invercargill Railway Station to be in attendance in order to salute the arrival of the train "with a salvo of artillery". The members of the Demonstration Committee responsible for the arrangements would then be formally introduced to the official guests conveyed on the express. Thereupon the Garrison Band, with the Battalion lining the route, would lead the guests the short distance to The Athæneum Library in Dee Street where they would continue playing while the guests were being conveyed to their respective hotels.

Illuminated by Night

Invercargill would be "illuminated" in the evening, primarily by gas and featuring some some designs described as "very handsome and expensive", but also with the use of one of Messrs Proudfoot and McKay's [the Railway Contractors for the new section of line] electric lights at The Athæneum. Electricity would be generated by an engine supplied by The National Mortgage and Agency Company. The Fire Brigade, with 38 men, would lead a torchlight procession commencing at 10 o'clock sharp down Dee Street then up Tay Street, and if the torches held out, down Esk, Kelvin and Don Streets. The evening would also occasion "a railway employees' ball".

A "Fearful Strain" on Accommodation 

With so many guests arriving in Invercargill "including crowds of people from the country", the question of accommodation arose. "The Railway Demonstration Committee" asked members to do all they could as a "fearful strain" would be placed on hotel accommodation and even "shake-downs of the roughest style will be at a premium". Visitors would "be none the worse for providing themselves liberally with travelling rugs" as "the crush will occasion some discomfort".

"The Ladies are Indignant"

And there would be no skimping on good southern hospitality. "The Invitation and Banquet Committee" called for tenders for a substantial hot dinner catering to a minimum of 200 guests although a tender for a cold collation with hot soups and vegetables could also be submitted. Sufficient liquor would need to be provided for twelve toasts.

The Invercargill City Council, on behalf of the Mayor, sent out some 100 telegrams and an equal number of written invitations "to those gentlemen who are to be invited to the banquet" which would commence at 7 pm. This will no doubt account for the short but rather acerbic comment in one newspaper column, "The ladies are indignant". The banquet itself would take place in the new Sloans Theatre in Dee Street, and "the upper portion of the house will be reserved for ladies desiring to be present [ie, only to observe] and also for gentlemen holding banquet tickets".


Clinton Railway Station with the Hotel and
Refreshment Rooms at left, taken 1895
[Source : "Steel Roads of New Zealand"]

A Shocking Accident Halts the Express  

Already late departing Clinton, the express had made good time on the journey to Gore which runs due west through the remote settlements of Wairuna, Waipahi, and Pukerau. Just before passing East Gore the line crosses a substantial bridge spanning the Mataua River.

On the footplate of the second engine was "Mr Smith, of the Engine Department" along with the afore-mentioned Mr Conyers, the Commissioner of Railways for the South Island, who appears to have preferred being "up front" where he could observe the performance and handling of his locomotives.

But as the express, "which was not going at [a] great rate" negotiated a curve at East Gore before crossing the Mataura River bridge the engine brakes were suddenly applied with the "sharp, shrill shreaks of the engines denoting that something had gone wrong" followed by the cry of "A man off the train". That man, to the absolute horror of those on board, was found to be Mr Conyers. "Hundreds of people ran along the line to where the unfortunate gentleman lay, about fifty yards from a  water tank placed on a pile of sleepers."

It appears that initially, a dog had been run over. Although no one could definitely say that Mr Conyers had actually seen this event, he did at the very least lean out from the footplate to get a better view of the rear of the train and possibly to ascertain the result of this mishap. "A few minutes before [he] was conversing with the driver, who suddenly turned round, missed him, and gave the alarm".

A lady residing in a nearby cottage witnessed the whole incident but apparently not the dog. Unfortunately, a pile of sleepers supporting a water tank projected rather too closely to the line and Mr Conyers, while looking back as the train rounded the curve, was hit by one of the sleepers. He initially held on for about 50 yards before falling to the ground with "a severe cut over his eye", being rendered "insensible and bleeding profusely from ears and nose", and "breathing stertorously [gasping]".

With plenty of medical assistance at hand, Mr Conyers was placed in the nearest railway van and, after having had his head wound stitched, taken on the train slowly into Gore where he was provided with a bed in Green's Hotel, the afore-mentioned Mr Smith remaining with him.

The special express could now continue onto Invercargill as planned but had already been delayed by over an hour due to the accident. Having crossed the above Matuara River bridge at Gore, which consists of ten spans of forty feet each being completed in October 1874, the express now continued due south, the line following the contour of the Mataura Vallev to Edendale which was passed at 5.20 pm. Here the line again turns due west, soon ascending a 120 foot high terrace then through a deep cutting, presenting the steepest grade on the line before continuing "along an almost dead level" to Invercargill.


K94, one of the K Class Locos ordered in 1878,
as it appears today at the Plains Railway.
[From my own collection]

Invercargill "En Fête"

In Invercargill, "The day broke beautifully fine and the sky... remained almost cloudless throughout the day." and the town was "en fête" with high holiday being kept during the afternoon. Bunting and Chinese lanterns were suspended from many buildings while flags flew from every "coign of vantage". The militia had taken up their positions opposite the Railway Station as planned, while the artillery had placed their cannon ready to welcome the train, "Hundreds of people" lined the area facing the Railway Station and The Crescent and "nothing remained undone that could have been foreseen". "...triumphal arches and all kinds of decorations abounded [while] the railway station was handsomely got up with evergreens &c."

Never Was Greater Sorrow Expressed at a Public Calamity

But it was at this time that a telegram arrived from Gore notifying the accident to Mr Conyers and that the train had now been further delayed. "Never was greater sorrow expressed at a public calamity, and the Telegraph Office was besieged with persons anxious to obtain particulars of the accident." As the amount of telegraph traffic caused a virtual "block" on communication, it was shortly after 5 pm before word arrived to confirm that the express had departed from Gore.

At precisely 6.15 pm, being fully two hours late and "eight hours on the road", the express consisting of "two very fine powerful locomotives, 15 carriages and three brake-vans"  finally pulled up to the Invercargill Railway Station platform (now confusingly facing north), being met with a salute from the artillery. Thereupon the official guests were welcomed on the platform by the Mayor of Invercargill, the Chairman of the County Council, and members of the Demonstration Committee. While "exchanging congratulation on the connection of the towns of Christchurch and Invercargill", there were also sincere expressions of regret at the accident that had marred the day's proceedings. While the Invercargill Garrison Band played "the New Zealand Anthem" the guests were escorted from the station to their accommodation. While considerable difficulty was in fact experienced in finding accommodation for everyone, "shake-downs and so forth were put up with, with good grace."

The Banquet and Presentations

While the Demonstration Committee had discussed whether the banquet should proceed, it was felt  that "it could not be well postponed". At the newly opened Sloan's Theatre in Dee street, but fully an hour late starting, "the upper portion of the house was filled by ["well dressed"] ladies, and the whole of the seats at the table, 300, were occupied". The brass band occupied the stage "and over the footlights was suspended long festoons of evergreens with a pendant bouquet in the centre, and a design with the words inscribed in it 'Christchurch, Dunedin and Invercargill' "

The usual speeches, toasts, and replies were given including an acknowledgement of "the very general esteem in which Mr Conyers was held". Such was his standing that a collection of around £40 had been taken up on the train by "Mr John Olliver" only about half an hour before the accident to enable a diamond tie pin to be purchased which was intended to be presented to Mr Conyers during the banquet, including a similar gift for Mr Grant, the Railways General Manager. The former would not receive his gift until the 25th April 1879, a railway themed clock (described below) with an engraved plate commemorating the opening of the through route to Invercargill being considered a more appropriate gift.

The Governor Would Have No "Brown Towns"

During his reply, the Hon. Member of Parliament, Mr William H. Reynolds, stated, and no doubt to an appreciative and relieved audience, that he had himself had had a personal hand in naming the town. It had been proposed by Captain Cargill to name the town "Browntown" after the then Governor "but the Governor would have no Brown Towns", also to the relief of those in the south who "narrowly escaped the designation of 'Brown Town' ". So the Hon. Mr Reynolds himself suggested that Captain Cargill's name be associated with the town (being the founder of the Province of Otago and its first Superintendent), so thus it was named, with the approval of the Governor, Invercargill ["Inver" is a Scottish term meaning "the mouth of a river"].  


A "K" Class Locomotive on the turntable
at the Invercargill Roundhouse, c.1880
[Source : WW Stewart]

Not Forgetting the Early Railway Pioneers

All honour was also given to Sir Julius Vogel, who had sent a congratulatory telegram, "for the conception of the public works scheme and for the courageous stand he took in the face of great opposition thereto". Vogel, as Colonial Treasurer, had been instrumental in courageously, and with some considerable degree of foresight, borrowing the then vast sum of ten million pounds in London for the purposes of developing significant infrastructure in the colony, especially roads, railways and communication.

The absence of two gentlemen was also regretted, being Sir William Sefton Moorhouse, second Superintendent of the Province of Canterbury, and "the initiator of railways in Canterbury" and of the Hon. Dr. James A. Menzies, past Superintendent of the Province of Southland, and "the initiator of [the railways] in Southland". "Eleven years ago in the Southland Provincial Council, he [Dr Menzies] stated that he believed he would be able to travel before he died  - and he was then an old man - by railway from Invercargill to Dunedin, and now that he could get over double the distance he considered that he had been no false prophet."

The Mayor of Christchurch "contrasted the appearance of the country and of Invercargill with that presented when twenty years ago he walked from Dunedin to Invercargill."  

While one or two toasts on the list were omitted due to pressure of time, it was no doubt considered prudent to give the usual toast "to The Ladies", who were of course watching from "the capacious dress circle" above, being suitably responded to by the Hon. Mr Henry Feldwick, Member of Parliament for Invercargill.

The "Brightness and Clearness" of the Electric Light

Despite the "untoward contretemps" [unfortunate accident and delays] that took place on the day the visitors, along with the citizens of Invercargill, would now be treated to the Fire Brigade torchlight parade commencing at 11 pm through an illuminated Invercargill, finishing at a quarter to twelve. Nearly twenty "sulphuric lights" were displayed all along the route with "dozens of rockets" of various colours being let off at short intervals". The "brightness and clearness" of the electric light displayed at The Athæneum drew "general admiration amongst the immense crowd of spectators assembled in the street below".

A Curious Fact

"The great fact of the connection of the by railway of the chief cities of the Middle Island is now accomplished. Invercargill is within two days' easy travelling of Christchurch whilst in an emergency the journey could be made in one." It is however also a curious fact that within the very first day of the opening of the new through route it would, as detailed below, prove necessary to run an "emergency" train from Christchurch.  

And What of the Unfortunate Mr Conyers?

Authority was requested and readily granted to keep telegraphic communication with Gore open overnight. Having commenced his railway career in Southland there was widespread local concern for his welfare. Evening telegrams confirmed that Mr Conyers was "much the same, if anything slightly better". 

Upon hearing of the accident and with Mr Conyers' condition being deemed extremely critical, "a special express train" conveying his wife, Fanny Conyers along with some of her children, Mr Buck (the General Manager of Railways) and several others, left Christchurch at 7.30 pm that evening, reaching Gore the following morning at 11 am, an uncomfortable and gruelling fifteen and a half hours journey.

After suffering "a very restless night", regular reports on Thursday state that Mr Conyers was then in a "semi-conscious state" and that Mrs Conyers, whom he recognised, along with his son, were with him. Luckily he had not suffered any skull fracture but his condition was "still in a very precarious state".

After a few days he was reported as being "only partly conscious" with "less feverishness" and making "satisfactory progress". By the 27th he was "very much better" and "readily recognises his friends, and though he frequently wanders in his expressions, everything betokens a quick recovery."



Details of the Railway Themed Clock
presented to Mr William Conyers in 1879
[Source : Papers Past]

A Significant Railway Career in the South

Conyers, who had been born in Leeds England where he gained his engineering qualifications, had "for many years" been "Manager of Southland Railways" (I note that in 1868 he held the positions of "Locomotive Manager" and "Manager of Permanent Ways" on the Bluff Harbour and Invercargill Railway), before being promoted to the position of General Manager of Otago Railways in 1874 at the then very generous salary of £900 pa. He was further promoted to the position of South Island Railways Commissioner in February 1878.

While he physically recovered from his injury, for which he [according to one source] received "substantial compensation", and resumed his railways position on the 14th April, "he was never the same man again." After his position was nationally disestablished in 1880 he held the position of "engineer and secretary and treasurer" for the Bluff Harbour Board until 1889. William Conyers died at Kew in Melbourne, Victoria on the 6th June 1915, aged 76 years. 


Sources :

- Papers Past [National Library of New Zealand / Te Puna Mātauranga o Aotearoa]
- Trove [National Library of Australia]
- "Steel Roads of New Zealand" - Edited by Gordon Troup 1973 (from my own collection)
- "Register of New Zealand Railways Steam Locomotives", by WG Lloyd, 1974 (from my own collection)
- Alexander Turnbull Library / Te Puna Mātauranga o Aotearoa
- Kiwirail.co.nz


Sunday, 8 March 2015

The Changing Southern New Zealand Railway Landscape


My 2013 Blog on the sale of the "Kingston Flyer" tourist steam train (which incidentally has still not yet sold) prompted me to go back through my collection of railway related photographs which I took in Southland and Otago in the South Island of New Zealand through the early to mid 1980's.

I do appreciate that this Blog will have a narrow focus of interest for many readers. But these images emphasize how much has been swept away, not only by line closures but also by rationalisation and modernisation of operating procedures and infrastructure in the name of efficiency, and reducing costs and maintenance. A considerable number of Internet searchers find images my Blog via Google and other Search Engines. So these photographs, which are now over 30 years old, may prove interesting. And while much of what we see here had remained for over 100 years, the 1990's brought a much changed railway landscape. Almost all of what you see is no more. If it still exists I have noted this.

I do apologise for the lack of "trains on tracks" or people in these views. I took them at the time to preserve something of this heritage for myself rather than others as I knew their days were numbered.

Clinton Railway Station - October 1981

Clinton became was for very many years a busy refreshment stop for passenger trains, hence the long platform. Passengers would pile out of their trains and make a dash for the refreshment room, taking their tea in thick railway monogrammed crockery cups, pies, sandwiches, buns and cakes back onto the train. Service thus had to be quick. The station became, after the introduction of the diesel hauled Southerner Express in December 1970, along with on-board catering, merely a shadow of its former self, acting only as a brief passenger stop. All you see, including the goods shed with its distinctive curved roof, is gone.  










Waipahi Branch Railway, circa 1982

The Tapanui branch line from Waipahi closed in 1978 after major flood damage. This typical New Zealand Railways wooden truss bridge on stone piers spanning the Pomakaka River inexplicably survived after closure and subsequent lifting of the line. I believe it can still be seen today on Pomahaka Road about 400 metres north of the turn-off to Conical Hill Road. 


Pomahaka Railway Bridge



Gore Railway Station and Semaphore Signals - circa 1982  

Mersey Street Signal
Box which controlled
the whole station
Mersey Street Crossing showing
the Signal Box and the old Post
Office (which originally had
 a clock tower)

The former route of the Waimea
Plains Line past the old Post
Office building at right. Taken
 looking towards the Station 


Gore Railway Station Platform.
Note the "Ladies Waiting Room"













Gore Station south end
Semaphore Signal Gantry
taken looking south
Gore Station south end
Semaphore Signal Gantry
taken looking north













Oporo Locomotive Dump, Branxholme, Southland, circa 1982

A large number of old locomotives and tenders, comprising of V, P, K and even one early J Class, were dumped at Oporo by the Oreti River on the branch line through to Thornbury in 1927. At a time when scrap iron prices were obviously low, these venerable but now non-standard and generally worn out old 19th century locomotives were tipped over the edge of the line by the Oreti River to act as flood protection for the railway embankment. A number of locomotives and tenders plus spare parts from others have been subsequently recovered, including the restored - and now world renowned - American built Rogers locomotive K88 "Washington" of 1877 vintage and the unrestored Rogers K94 of 1878. Contracting work undertaken to stabilise the bank after these photos were taken covered over many of the remains. I can recall that there was evidence of cuts in metal and boilers of an indeterminate date, possibly removing white metal and copper or anything salvageable that could be sold to a scrap metal dealer. Another locomotive dump exists beside the Oreti River at Mararoa Junction but only a few pieces of unidentified metal were visible above ground when I visited the site about 1982.        


A "V" Class locomotive lies upside down,
the front buffer beam at right

A locomotive tender
Detail of the above buffer beam
and left-hand cylinder












Two boilers covered in
undergrowth and gravel
Inside view of a boiler showing
the large & small flue pipes 














Winton Railway Station, Dec 1982


Winton Station Platform
and Goods Shed
Winton Station Platform
showing a parcel trolley 













Winton Railway Station, dating from
the 1870's. The canopy had been
added later. 
Winton Railway Station
looking south












Winton Station Ground
Frame which operated
the Semaphore
Signals and possibly
yard switching 

This station retained a Station Master until closure but sadly freight volumes had dropped significantly over the previous few years.


Centre Bush Good Shed, circa 1982




This goods shed remains standing but is sadly continuing to deteriorate badly. 


Mararoa Junction, Mossburn Branch Railway, circa 1982







This had been a combined road and rail bridge across the Oreti River and enabled the Mossburn line to cross the Oreti River. The Mararoa locomotive dump was located very close nearby but there is now very little to see above ground. This distinctive and once very common type of wooden bridge was swept away after a new double lane concrete bridge was built, the Mossburn to Mararoa Junction branch line having already closed,


Athol Goods Yard, Kingston Branch Railway, circa 1982





The distinctive sloping roof, as at Athol and many other stations and wayside halts, assisted when there were heavy snowfalls.



Kingston Branch Railway, circa 1982
(after closure)
















Kingston / Mitivot
Kingston Branch Railway, 1985



This is the replacement Kingston Railway Station, being part of the Riversdale Railway Station and moved here to be ready for the opening of the new "Kingston Flyer" tourist steam train in 1970. The station had been temporarily re-named for filming of a French automobile advertisement.

Steam locomotive AB795, having been built at Hillside Workshops in Dunedin in 1927, has just rolled into view. This locomotive, along with AB778, formed part of the newly formed "Kingston Flyer" heritage train running the 60 kilometres between Lumsden and Kingston in Central Southland. Since 1982 the "Kingston Flyer" has only run the 14 kilometres between Kingston and Fairlight but since 2012 has been mothballed and is currently for sale for NZD$2.5 million which includes the rail corridor and associated land and buildings [Link Here]. The last privately run operation proved uneconomic and it may well be that the local Council will sadly have to remove a heritage order preventing the train from being removed and operating elsewhere.


Restoration of American Built Rogers K92, 
Fiordland Vintage Machinery Club, Te Anau, circa 1986











American Rogers Locomotive Works K92, built in 1878 and having been exhumed from the Mararoa Junction locomotive dump by the Oreti River where it had been dumped in 1928, is now owned by the Waimea Plains Railway at Mandeville. Although its boiler ticket has now expired it had quite amazingly used the original pre-dump boiler dating to the early 1900's, a new boiler will most likely now be required. As opposed to the rather "flashy" restored American Rogers K88 of 1878 it has been restored to its circa 1910 guise which affords a rather interesting comparison.


A "Grass Grub" and Baggage Car 
at Christchurch Railway Station, circa 1982 


An ex-Drewry 1955-56 articulated railcar converted
to locomotive hauled carriages. Not designed for this 
type of haulage they had very a short life-span.

The railway station itself, although then used for other purposes, suffered serious earthquake damage in 2012 and parts of it have been demolished. The tower, which remains a Christchurch icon has been externally reinforced in order to support it due to cracking.


An old Vice-Regal Carriage at Arthur's Pass 
& used as a "Camping Coach" by NZ Railways Staff

I understand this carriage was later moved and
restored for private use.


A "Grass Grub" at Otira on the West Coast Line


Ex-Drewry articulated railcar of c.1955-56
and converted to locomotive haulage



Bibliography :

- All images are from my own collection and may be freely copied for non-commercial use provided a link is given back to this site. I still hold the original 35mm negatives and it may be possible to obtain higher resolution copies.  

Monday, 17 June 2013

The Euston Arch - Shall It Rise Again?


The Imposing Euston Arch, built in 1837 as the
Grand Entrance to Euston Railway Station London 

A recent Blog by 'Melbourneblogger' on the historic London Bridge of 1831, which had been taken down stone by stone and rebuilt at Lake Havasu City Arizona in 1971, reminded me of another iconic London structure which has now largely been forgotten - The Euston Railway Arch. Sadly, the latter was not to enjoy an honoured 'retirement', being ruthlessly demolished amidst huge opposition in 1961-62. However, a recent interesting discovery may mean that this woeful act of architectural vandalism can now be remedied.

But first, what was this Arch, where was it built, and why was it famous?


A period drawing of the Euston Arch under construction, 1837-38

The 'Euston Arch', in the form of a Doric 'Propylaeum', the largest in Britain, had been built in 1838 as the grand front entrance portico to the 'London and Birmingham Railway' Station on Euston Road, London :

"The Entrance to the London Passenger Station opening immediately upon what will necessarily become the Grand Avenue for travelling between the Metropolis and the midland and northern parts of the Kingdom, the Directors thought that it should receive some architectural embellishment. They adopted accordingly a design of Mr. [Philip] Hardwick's for a grand but simple portico, which they considered well adapted to the national character of the undertaking." [L&B Railway Report, 1837]


Euston Railway Arch and flanking pavilions, as built, 1838

This structure was the first great monument to the Railway Age and for close to 135 years served as the 'gateway' from London to the north. Standing an impressive 72 feet high (22 metres) and 44 feet deep (13 metres), the diameter of each of the columns were an equally impressive 8 feet 6 inches (2.59 metres). This "simple portico" still cost the then large sum of £35,000 On each side of the Arch were two 'lodges' or pavilions in the classical style, being separated by decorative and imposing cast iron gates.


A circa 1910 view of Euston Arch facing Drummond Street

But not everyone viewed the Arch positively. As early as 1851 one guide viewed it as "gigantic and very absurd". A later station owner, the 'London and North Western Railway', had the lettering "EUSTON" proudly incised on the pediment in 1870.


The red arrow marks the location of the Arch fronting Drummond
Street and the Euston Hotel. The 1968 rebuilding removed part of
Drummond Street and Euston Street to make way for the new
Railway Station and approach.
[From a 1908 map in my possession]

Unfortunately redevelopment in 1881 removed the westernmost pier and lodge of the Arch to make way for offices, and soon afterwards a hotel extension blocked the clear view from Euston Road. This spoilt the original classical design and symmetry of the whole structure. But the Arch itself still stood proud, although by now somewhat hemmed in and encrusted with grime.


A 1936 aerial view of Euston Station showing the original
location of the Arch fronting Drummond Street with the
Euston Hotel in foreground. Post 1881 Victorian buildings
have encroached on the original grand station frontage.  

But even by 1938 the fate of the Arch had been in the balance. A plan by the then owners, the 'London, Midland and Scottish Railway' [LMS] envisaged removing the Arch to facilitate the building of an imposing new railway terminus in the "stripped classical style" based on an American inspired design. But to his credit, a Georgian Conservation lobby group managed to persuade Lord Stamp, the President of the LMS Railway, that removal and rebuilding of the Arch on Euston Road was entirely possible if not desirable. But sadly, the Second World War halted all further progress and by 1948 the mighty LMS Railway itself had even ceased to exist, having now become part of the newly nationalised "British Railways". A whole decade would pass before the fate of the Euston Arch and of the old and congested but 'atmospheric' L&NW Railway Station would again come to the fore.


A 1960 colour slide of Euston Arch with
the name highlighted in gold paint

The axe finally fell in January 1960 when the British Transport Commission notified its intention of demolishing the 'inconvenient and outdated' old L&NWR Euston Station - including the iconic Euston Arch. Alas the 1849 "Great Hall", with its wonderful coffered ceiling adjoining the station, would also be demolished. While the suggestion was again put forward that the Arch could simply be re-sited, no one was willing to fund the estimated £180,000 cost. A myriad of last minute lobbying ultimately proved fruitless.

Demolition in Progress, 1961-62

The entirely unsympathetic Conservative Party Prime Minister, Harold Macmillan, who had the power to veto the demolition, "stated that he had decided against adopting the suggested preservation strategy, and explained that "every possible way" of preserving the arch had been investigated by the British Transport Commission, but the lack of available land, the operational requirements of the station and the removal costs entailed made the project unfeasible."  


Demolition in Progress, 1961-62
Note the stone stacked up on the ground

The 'Euston Arch' had acted as the grand entrance to this major London Railway Terminus for almost a century and a quarter, becoming a well-known and iconic landmark to generations of travellers. But it would now, despite "massive opposition", be ruthlessly demolished to create a convenient but clinical and soul-less flow-through station and precinct befitting the 'modern' image which British Railways now wished to project. The quite striking late 1930's combined LMS Station, Hotel and Offices would have been wholly preferable. But this was but one example of the "desecration" of our heritage then endemic in post World War Two Britain. It is interesting, if not ironic, that the wave of opposition to this demolition, although ultimately unsuccessful, effectively strengthened the successful and coordinated campaigns to save other iconic railway structures and architecturally significant buildings. The now restored and venerated St Pancras Hotel in London is cited as being one significant example.


Demolition in Progress, 1961-62

A short but fascinating seven minute UTube video detailing the actual demolition, which began in December 1961, may be viewed Here. Jack-hammers roughly prised apart the stonework with no thought of preservation. The demolition contractor, Frank Valori, stated that he had undertaken the demolition "without pleasure". His offer to store the stones at his own expense for a future rebuilding was turned down, no doubt because it would have increased the demolition costs as extra care would have been required. Two side 'lodges', which must have formed part of the original Railway Station, were however rebuilt facing Euston Road with an entranceway to the new Station in between. And there ended the story of the Euston Arch - until 1994 that is.


The two small side 'lodges' rebuilt on Euston Road, as I viewed
them in 1986. The long building in the centre is offices built in
front of the new 1968 station building.
[From my own collection]

In that year, the Architectural Historian and TV presenter Dan Cruickshank, and after a 15 year search, discovered that some surviving stonework had been used in the demolition contractor's own garden, partially as a garden terrace, as foundation material, and for a pond. This then led to the discovery that Valori had sold around 60% (about 4,000 tons!) of Euston Arch stone to British Waterways to fill a chasm in the Prescott Channel of the River Lea in East London. Cruickshank arranged for a section of one fluted column to be raised up from the river bed to show that the hard stone, which had come from a quarry in Yorkshire, had weathered little. Further stones were raised by British Waterways in 2012 in connection with other work associated with waterways serving the Olympic Park.


Dan Cruickshank supervising the recovery of a pediment stone
from the River Lea. Damage to the stone is clearly evident.

In 1996, Dan Cruickshank launched the "Euston Arch Trust" which aims to raise public awareness, to raise the necessary funds to rebuild the Arch, and also to attempt to restore the early nineteenth century Euston Square which had also fallen victim to the re-development of Euston Station. To date progress by the Trust has been slow but steady.


Dan Cruickshank with a section of one of the fluted Doric
columns. The original light coloured stone under the grimy
exterior is just visible around the damaged edges 

The current station owners, "Railtrack", support the idea of rebuilding the Arch but as at 2009 the expected combined recovery and rebuilding costs stood at £10 million. Sub-letting space in and under the Arch has been suggested as a means of generating some revenue to recover costs, including a 'banqueting hall' at the top of the Arch and a 'night-club' in the basement. Steel would replace the original brick shell of the Arch to increase space. The well-known comedian, actor, writer and television presenter, Michael Palin, has now also joined the campaign to rebuild "the first great building of the railway age" writing;

"The enormous popularity of the restored St Pancras has shown that celebration of the past and potential of the future are not mutually exclusive. The restoration of [the] Euston Arch would restore to London's oldest mainline terminus some of the character and dignity of its great neighbours."


The L&B Railway Curzon Street Station Booking Hall,
Refreshment Room and Offices, Birmingham.
Now standing in total isolation but secure.

It is interesting that the 'orphaned' but still extant 1838 Grade One listed grand booking hall, refreshment room and offices of the same 'London and Birmingham Railway' at the other end of the original line in Birmingham will be incorporated into the overall design of the new High Speed 2 ('HS2') Rail terminus. Now we respect and honour the past instead of tearing it down. Euston Station is planned as the London terminus for 'HS2'.


How the rebuilt Arch would appear on Euston Road
placed between the two existing pavilions.

It was announced in April 2013 that while Euston Station would still be developed as the London terminus for 'HS2' it would be in a scaled back format using existing facilities rather than outright demolition and rebuilding of the current 1968 station. Although new plans are yet to be released these should not affect the Euston Arch rebuilding proposals. The Arch originally stood back from Euston Road about where the buffer stops are in the current station so rebuilding at the original site would in any case be impossible. The universally agreed ideal position for a rebuilt Arch is fronting Euston Road between the two rebuilt 'lodges', thus somewhat restoring the context of how it originally appeared, but still fronting the present Euston Station site. That the Arch would again serve as the grand railway "Gateway to the North" is highly appropriate. But the continued presence of what I consider to be an ugly four story modern office block on pillars, with an entirely open ground level enabling vehicular and pedestrian access through to the 1968 station, is unfortunate. Continued convenient access to an even busier "HS2" railway station will now be the main consideration, besides finding the necessary funding to rebuild the Arch. 


An early Victorian engraving of the Euston Arch and
flanking pavilions, as drawn for the "British Gazetteer". 

There now appears to be plenty of original stone to work with and the consensus of opinion is that it would be reprehensible not to attempt to use it. Obviously, even when the necessary funds are forthcoming, the state of the damaged stonework will provide many challenges as much of it will need to be heavily repaired or re-carved from new stone. Reconstructed buildings in Germany show that this is, with care, entirely possibly and that a mix of original and new elements matching the original does not necessarily detract from the original historic authenticity of a structure. When rebuilt, the Arch would undoubtedly be Grade One listed, the maximum protection a building or structure can be given. That this Arch has somewhat slipped from the public radar is primarily due simply to the fact that it has not been visible for the past fifty-one years, almost a whole generation. The original and highly decorative cast iron gates, which had been manufactured in the foundry of the Engineer and Locksmith, John Joseph Bramah in 1838, are now on public display in the National Railway Museum at York.


The original Euston Arch Gates, now in the
National Railway Museum at York
[Photo credit : S Carroll]

A close up of the gates showing the
London and Birmingham Railway Coat of Arms
[Photo credit : S Carroll]

As Dan Cruickshank wrote, "Its destruction was an act of barbarism. Now a great cultural wrong can be put right."  We wait and hope that this grand Arch and monument to the great Victorian Railway Age can again be restored to its proper place in London.  


Bibliography :

- Various Internet Resources
- The Euston Arch Trust
- The Euston Arch Campaign [UTube Video]
- Unless otherwise stated all images are from Internet sources and are in the public domain.